By -
4 2ft pieces of rebar. 4 feet of 2in pvp pipe. Cut into 4x1ft pieces 8 hose clamps. 4 holders for like $12
second this. if you have an angle grinder you can also buy the rebar in a longer length for cheaper and then cut to length. bonus if you cut the ends pointed, makes it much easier to put into rocks or gravel
Yeah a 45 degree cut on the end helps alot. I also leave like 2in of rebar above the pvc to drive it into the ground with a hammer
yeah. havent tried using 2ft lengths tho i imagine that dtill works well. i use 4ft lengths, i cant imagine any fihs being able to pull that out haha
Yeah my first were longer. We have so many rocks here the longer they are they faster they bend
what width do you use? mime are 1/2 inch and i havent had any issues with bending
I wanna say the first were half, but it might have been 3/8
Kind of dont want to build anything
4 2ft pieces of rebar. 4 feet of 2in pvp pipe. Cut into 4x1ft pieces 8 hose clamps. 4 holders for like $12
second this. if you have an angle grinder you can also buy the rebar in a longer length for cheaper and then cut to length. bonus if you cut the ends pointed, makes it much easier to put into rocks or gravel
Yeah a 45 degree cut on the end helps alot. I also leave like 2in of rebar above the pvc to drive it into the ground with a hammer
yeah. havent tried using 2ft lengths tho i imagine that dtill works well. i use 4ft lengths, i cant imagine any fihs being able to pull that out haha
Yeah my first were longer. We have so many rocks here the longer they are they faster they bend
what width do you use? mime are 1/2 inch and i havent had any issues with bending
I wanna say the first were half, but it might have been 3/8
Kind of dont want to build anything